Outages

Steven & Susan Lipstein BJC Institute of, Euclid Power Plant, Biotechnology Center, East Building, East Imaging Center, Mid Campus Center-Electric Services Interruption 3/14/2021

The purpose of this outage is to perform maintenance and testing on the electrical switch gear in the Mid Campus Substation. This is the first of three outages required to safely and effectively service the switch gear. The above listed building will be single lined to one Electrical Utility. We anticipate no loss in power during this outage.