Outages

Steven & Susan Lipstein BJC Institute of Health-Electric Service Interruption 4/11/2021

The purpose of this outage is to perform maintenance and testing on the main electrical systems in the BJCIH building. This is the first of five outages required to safely and effectively service the switch gear. We will be switching the building to one electrical feed in order to perform the necessary work. We do not anticipate the required switching to cause any power loss or blips.

As a precautionary measure, no work may take place in the B120 ABSL3 suite on April 11th 7am-11am.