Facilities will be conducting some maintenance on May 10th – 14th from 6:00am to 3:00pm everyday, during this time there will be reduced to limited air flow to the second and third floor of the East Imaging building.
Facilities will be conducting some maintenance on May 10th – 14th from 6:00am to 3:00pm everyday, during this time there will be reduced to limited air flow to the second and third floor of the East Imaging building.