Facilities Operations Update

4480 Clayton – Lift onsite to repair first and second floor window repairs

On Tuesday, December 21, 2021, a lift was brought to 4480 Clayton south parking lot to locate areas along accessible window perimeters where water has infiltrated the building and to make repairs. The work will take place on windows on the first and second floors on the west, east, and south sides. See aerial photo for the sections in need of immediate repairs.
The lift needs to remain onsite until the repairs are completed. The repairs should be completed by mid-January, weather permitting.

For any questions, please contact Engineering Project Manager, Antwoine Feaman.