On July 15th from 5 am to 8 am we will performing a controls reboot on air handling unit 2 for the SIRF East facility after recent failures. In this time there will be limited to no airflow to the 2nd floor.
On July 15th from 5 am to 8 am we will performing a controls reboot on air handling unit 2 for the SIRF East facility after recent failures. In this time there will be limited to no airflow to the 2nd floor.