Elevators in these buildings will be tested on standby power on Monday and Wednesday, August 8 – 10, from 6 am – 7 am. While testing the elevators on emergency power, lighting and equipment that is connected to emergency power will experience a fault at the time the power is transferred. During this time, the elevators will be out of service.
The following list shows the elevators that will be tested:
No 96 Northwest Tower – August 08
No 97 Northwest Tower – August 08
No 98 Northwest Tower – August 08
No 99 Northwest Tower – August 08
No 131 MCC Service – August 10
No 132 MCC Passenger (East) – August 10
No 133 MCC Passenger (East) – August 10
No 134 MCC Passenger (East) – August 10
No 135 MCC Passenger (East) – August 10
No 136 MCC Passenger (West) – August 10
No 137 MCC Passenger (West) – August 10
No 138 MCC Passenger (West) – August 10
No 139 MCC Passenger (West) – August 10