Outages

CSRB North Tower Addition-Air Handling Unit 9/19/2022

On Monday, September 19th 4:30 pm – 6:30 pm air handling unit 10B will be off to add an access panel to the unit. In this time frame frame the will be limited to no airflow and heating/cooling to the 10th floor of the CSRB building.