Outages

CSRB North Tower Addition-Air Handling Unit 9/20/2022

On Tuesday, September 20th 4:30 pm – 6:30 pm air handling unit 9B will be off to add an access panel to the unit. In this time frame frame the will be limited to no airflow and heating/cooling to the 9th floor of the CSRB building.