On Thursday, September 2nd 4:30 pm – 6:30 pm air handling unit 4B will be off to add an access panel to the unit. In this time frame frame the will be limited to no airflow and heating/cooling to the 4th floor of the CSRB building.
On Thursday, September 2nd 4:30 pm – 6:30 pm air handling unit 4B will be off to add an access panel to the unit. In this time frame frame the will be limited to no airflow and heating/cooling to the 4th floor of the CSRB building.