On Saturday, September 21st 6 am – 4 pm Facilities will drain the heating hot water to the 9th floor to assist contractors. The 9th floor may see cooler than normal temperatures during this time.
On Saturday, September 21st 6 am – 4 pm Facilities will drain the heating hot water to the 9th floor to assist contractors. The 9th floor may see cooler than normal temperatures during this time.