Outages

Mallinckrodt Institute Radiology-Electric Institute Radiology 11/3/2024

On Sunday, November 3rd 7-11 am, facilities will be conducting an electrical outage of the entire building. The purpose of this outage is to clean the (6) 5Kv. switches located in the basement of the MIR building. In order to safely perform the required work, the utility power must be turned off. The generator will run and provide power to emergency lighting, red emergency receptacles, as well other equipment connected to generator power.