Elevators in the listed buildings will be out of service to be tested on emergency generator power, from 6 am to 7 am each day, from January 21st through January 23rd. When power is transferred, lighting and equipment connected to the emergency power system may experience a blip. The list that follows shows which buildings’ elevators will be tested:
- 1/21: CSRB
- 1/22: IOH
- 1/23: REN