On Monday, January 6th from 4-6 am facilities will be de-energizing power to seven air handing units (AHU) on the 10th and 11th floors in the building. These unit’s serve’s-controlled air in the coordinating corridors on these floors.
On Monday, January 6th from 4-6 am facilities will be de-energizing power to seven air handing units (AHU) on the 10th and 11th floors in the building. These unit’s serve’s-controlled air in the coordinating corridors on these floors.