On Saturday, April 5th, from 6 am – 12 pm, facilities will shut off the natural gas to the building to repair a gas leak on the riser of the 11th floor of the building.
On Saturday, April 5th, from 6 am – 12 pm, facilities will shut off the natural gas to the building to repair a gas leak on the riser of the 11th floor of the building.