Outages

Steven & Susan Lipstein BJC Institute of Health-Air Handling Unit Service Interruption 8/28-8/29/2025

Testing will be completed on the air handling systems serving the Vertical Expansion wet labs and basement vivarium. Supply air to the basement vivarium will be reduced intermittently during the outage with little to no impact to space temperature and humidity. Exhaust air to the Vertical Expansion wet labs will be off intermittently during the outage. Avoid using fume hoods in the Vertical Expansion during the outage times listed below. NO work may occur in the B120 ABSL3 suite during the outage times.

Outage times are as follows:
Thursday (8/28): 5:00 am to 7:00 am
Friday (8/29): 5:00 am to 7:00 am