At approximately 4:00 a.m., an Ameren UE power blip affected the building’s electrical system. At this time, Facilities Engineering is recovering the electrical systems, and we ask that “No Work” be carried out in the labs. A follow-up message will be sent once all electrical systems are functioning as usual.