Outages

Steven & Susan Lipstein BJC Institute of Health-Electric Service Interruption 10/30/2025

At approximately 4:00 a.m., an Ameren UE power blip affected the building’s electrical system. At this time, Facilities Engineering is recovering the electrical systems, and we ask that “No Work” be carried out in the labs. A follow-up message will be sent once all electrical systems are functioning as usual.