BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Enterprise Physical Operations-Medicine//NONSGML Events//EN
CALSCALE:GREGORIAN
X-ORIGINAL-URL:https://facilities.med.wustl.edu/events/
X-WR-CALDESC:Enterprise Physical Operations-Medicine - Events
BEGIN:VEVENT
UID:20160526T1500Z-1464274800.6816-EO-4776-1@128.252.98.35
STATUS:CONFIRMED
DTSTAMP:20260809T035113Z
CREATED:20160526T144047Z
LAST-MODIFIED:20160526T144047Z
DTSTART;TZID=America/Chicago:20160602T073000
DTEND;TZID=America/Chicago:20160602T160000
SUMMARY: BJC Institute of Health – Fire Sprinkler Service Interruption
DESCRIPTION: The purpose of this outage is to relocate a main fire sprinkle
 r line that passes through the 1st floor of the building due to the BJH con
 struction project on the 1st floor. During this outage the north side of th
 e building on floors basement through six will not have any fire sprinkler 
 protection.
X-ALT-DESC;FMTTYPE=text/html: <p>The purpose of this outage is to relocate 
 a main fire sprinkler line that passes through the 1st floor of the buildin
 g due to the BJH construction project on the 1st floor. During this outage 
 the north side of the building on floors basement through six will not have
  any fire sprinkler protection.</p>
CATEGORIES:Planned Service Interruption
ORGANIZER;CN="Michelle":MAILTO:lewismichelle@wustl.edu
URL;VALUE=URI:https://facilities.med.wustl.edu/events/event/bjc-institute-o
 f-health-fire-sprinkler-service-interruption/
END:VEVENT
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
DTSTART:20160313T080000
TZNAME:CDT
END:DAYLIGHT
END:VTIMEZONE
END:VCALENDAR
