BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Enterprise Physical Operations-Medicine//NONSGML Events//EN
CALSCALE:GREGORIAN
X-ORIGINAL-URL:https://facilities.med.wustl.edu/events/
X-WR-CALDESC:Enterprise Physical Operations-Medicine - Events
BEGIN:VEVENT
UID:20141029T1538Z-1414597136.6018-EO-1569-1@128.252.98.35
STATUS:CONFIRMED
DTSTAMP:20260730T021424Z
CREATED:20141029T134637Z
LAST-MODIFIED:20141029T134637Z
DTSTART;TZID=America/Chicago:20141103T060000
DTEND;TZID=America/Chicago:20141107T180000
SUMMARY: BJCIH – Electric Service Interruption
DESCRIPTION: All of the substations in the building will be transferred fro
 m one side of the substation to the other via automatic switching to perfor
 m maintenance. No interruption of power is anticipated.
X-ALT-DESC;FMTTYPE=text/html: <p>All of the substations in the building wil
 l be transferred from one side of the substation to the other via automatic
  switching to perform maintenance. No interruption of power is anticipated.
 </p>
CATEGORIES:Planned Service Interruption
ORGANIZER;CN="Michelle":MAILTO:lewismichelle@wustl.edu
URL;VALUE=URI:https://facilities.med.wustl.edu/events/event/bjcih-electric-
 service-interruption/
END:VEVENT
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
DTSTART:20141102T070000
TZNAME:CST
END:STANDARD
END:VTIMEZONE
END:VCALENDAR
