SUMMARY: CSRB-North Tower Addition – Air Service Interruption
DESCRIPTION: To make repairs to the HVAC system there will be reduced air f
 lows to the 4th and 5th floors during this time. No work should be conducte
 d inside of any BSL3 lab on the 4th floor during this time and activity on 
 the floors should be limited.
X-ALT-DESC;FMTTYPE=text/html: <p>To make repairs to the HVAC system there w
 ill be reduced air flows to the 4th and 5th floors during this time. No wor
 k should be conducted inside of any BSL3 lab on the 4th floor during this t
 ime and activity on the floors should be limited.</p>
CATEGORIES:Planned Service Interruption
ORGANIZER;CN="Michelle":MAILTO:lewismichelle@wustl.edu
URL;VALUE=URI:https://facilities.med.wustl.edu/events/event/csrb-north-towe
 r-addition-air-service-interruption-2/
END:VEVENT
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
DTSTART:20160313T080000
TZNAME:CDT
END:DAYLIGHT
END:VTIMEZONE
END:VCALENDAR