BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Enterprise Physical Operations-Medicine//NONSGML Events//EN
CALSCALE:GREGORIAN
X-ORIGINAL-URL:https://facilities.med.wustl.edu/events/
X-WR-CALDESC:Enterprise Physical Operations-Medicine - Events
BEGIN:VEVENT
UID:20181119T1825Z-1542651900.6037-EO-19519-1@172.23.128.19
STATUS:CONFIRMED
DTSTAMP:20260626T010149Z
CREATED:20181119T181152Z
LAST-MODIFIED:20181129T222100Z
DTSTART;TZID=America/Chicago:20181201T180000
DTEND;TZID=America/Chicago:20181201T220000
SUMMARY: CSRB – North Tower Addition – Electric Service Interruption
DESCRIPTION: In order to perform maintenance on the Main Electrical Switchg
 ear\, we will be de-energizing the ‘W’ Feed. This will affect the normal po
 wer and lighting on the Basement\, 1st\, 2nd\, 3rd\, 4th\, and 5th Floors. 
 The Generator will run for the duration of the outage\, providing power to 
 lights and equipment connected to Emergency power. […]
X-ALT-DESC;FMTTYPE=text/html: <p>In order to perform maintenance on the Mai
 n Electrical Switchgear\, we will be de-energizing the 'W' Feed. This will 
 affect the normal power and lighting on the Basement\, 1st\, 2nd\, 3rd\, 4t
 h\, and 5th Floors. The Generator will run for the duration of the outage\,
  providing power to lights and equipment connected to Emergency power.</p><
 p>Due to the potential effects on air there will be NO BSL3 work allowed on
  the 4th floor during this time.</p><p>We thank you for your patience and u
 nderstanding at this time.</p>
CATEGORIES:Planned Service Interruption
ORGANIZER;CN="Michelle":MAILTO:lewismichelle@wustl.edu
URL;VALUE=URI:https://facilities.med.wustl.edu/events/event/csrb-north-towe
 r-addition-electric-service-interruption-2/