UID:20151026T2117Z-1445894277.5881-EO-3476-1@128.252.98.35
STATUS:CONFIRMED
DTSTAMP:20260724T030246Z
CREATED:20151026T210811Z
LAST-MODIFIED:20151026T210811Z
DTSTART;TZID=America/Chicago:20151106T060000
DTEND;TZID=America/Chicago:20151106T150000
SUMMARY: CSRB- North Tower Addition – Service Interruption
DESCRIPTION: In order to support a 4th floor construction project there wil
 l be reduced airflow to the 4th and 5th floors periodically during this tim
 e.  
X-ALT-DESC;FMTTYPE=text/html: <table><tbody><tr><td>In order to support a 4
 th floor construction project there will be reduced airflow to the 4th and 
 5th floors periodically during this time.</td></tr></tbody></table><p> </p>
CATEGORIES:Planned Service Interruption
ORGANIZER;CN="Michelle":MAILTO:lewismichelle@wustl.edu
URL;VALUE=URI:https://facilities.med.wustl.edu/events/event/csrb-north-towe
 r-addition-service-interruption-2/
END:VEVENT