BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Enterprise Physical Operations-Medicine//NONSGML Events//EN
CALSCALE:GREGORIAN
X-ORIGINAL-URL:https://facilities.med.wustl.edu/events/
X-WR-CALDESC:Enterprise Physical Operations-Medicine - Events
BEGIN:VEVENT
UID:20170804T1354Z-1501854890.2676-EO-12065-1@172.21.70.41
STATUS:CONFIRMED
DTSTAMP:20260629T152738Z
CREATED:20170804T135252Z
LAST-MODIFIED:20170804T135252Z
DTSTART;TZID=America/Chicago:20170804T080000
DTEND;TZID=America/Chicago:20170804T160000
SUMMARY: CSRB – North Tower Addition
DESCRIPTION: PRACTICE OUTAGE At approximately 8:00 am till 4:00 pm there wa
 s a disruption with the electric system in the building which caused a malf
 unction with the HVAC system causing a neutral/positive room pressure alarm
  for room 461. At this time no work should take place within this lab. At t
 his time Facilities Engineering is in […]
X-ALT-DESC;FMTTYPE=text/html: <p>PRACTICE OUTAGE<br />At approximately 8:00
  am till 4:00 pm there was a disruption with the electric system in the bui
 lding which caused a malfunction with the HVAC system causing a neutral/pos
 itive room pressure alarm for room 461. At this time no work should take pl
 ace within this lab. At this time Facilities Engineering is in the process 
 of recovering the HVAC systems. A follow-up message will be delivered once 
 all mechanical systems and room pressures are working in a normal manor.</p
 ><p>We thank you for your patience and understanding at this time.</p>
CATEGORIES:Planned Service Interruption
ORGANIZER;CN="Michelle":MAILTO:lewismichelle@wustl.edu
URL;VALUE=URI:https://facilities.med.wustl.edu/events/event/csrb-north-towe
 r-addition/
END:VEVENT
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
DTSTART:20170312T080000
TZNAME:CDT
END:DAYLIGHT
END:VTIMEZONE
END:VCALENDAR
