BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Enterprise Physical Operations-Medicine//NONSGML Events//EN
CALSCALE:GREGORIAN
X-ORIGINAL-URL:https://facilities.med.wustl.edu/events/
X-WR-CALDESC:Enterprise Physical Operations-Medicine - Events
BEGIN:VEVENT
UID:20141105T0530Z-1415165445.3881-EO-1599-1@128.252.98.35
STATUS:CONFIRMED
DTSTAMP:20260730T021342Z
CREATED:20141104T224735Z
LAST-MODIFIED:20141104T224735Z
DTSTART;TZID=America/Chicago:20141105T060000
DTEND;TZID=America/Chicago:20141105T100000
SUMMARY: CSRB-North Tower – Air Handling Unit
DESCRIPTION: The purpose of this outage is to shut down each Air Handler Un
 it to perform an inspection of the Air Handler Unit Supply Fan System. Duri
 ng this outage the local HVAC systems on floors 4\, 5\, 6\, and 7 will oper
 ate at a 50% mode. Floors 4 and 5 will be affected from 6 a.m. […]
X-ALT-DESC;FMTTYPE=text/html: <p>The purpose of this outage is to shut down
  each Air Handler Unit to perform an inspection of the Air Handler Unit Sup
 ply Fan System. During this outage the local HVAC systems on floors 4\, 5\,
  6\, and 7 will operate at a 50% mode. Floors 4 and 5 will be affected from
  6 a.m. to 8 a.m. and floors 6 and 7 will be affected from 8 a.m. to 10 a.m
 .</p>
CATEGORIES:Limited Notice Interruption
ORGANIZER;CN="Michelle":MAILTO:lewismichelle@wustl.edu
URL;VALUE=URI:https://facilities.med.wustl.edu/events/event/csrb-north-towe
 r-air-handling-unit-2/
END:VEVENT
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
DTSTART:20141102T070000
TZNAME:CST
END:STANDARD
END:VTIMEZONE
END:VCALENDAR
