SUMMARY: CSRB-NTA – Electric Service Interruption
DESCRIPTION: To support the 4th floor renovation project\, electrical work 
 will be taking place during the above times. Although we do not anticipate 
 any interruption in service\, as a precaution there shall be NO work conduc
 ted in any BSL3 labs during the above times.
X-ALT-DESC;FMTTYPE=text/html: <p>To support the 4th floor renovation projec
 t\, electrical work will be taking place during the above times. Although w
 e do not anticipate any interruption in service\, as a precaution there sha
 ll be NO work conducted in any BSL3 labs during the above times.</p>
CATEGORIES:Planned Service Interruption
ORGANIZER;CN="Michelle":MAILTO:lewismichelle@wustl.edu
URL;VALUE=URI:https://facilities.med.wustl.edu/events/event/csrb-nta-electr
 ic-service-interruption-2/
END:VEVENT
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
DTSTART:20180311T080000
TZNAME:CDT
END:DAYLIGHT
END:VTIMEZONE
END:VCALENDAR