BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Enterprise Physical Operations-Medicine//NONSGML Events//EN
CALSCALE:GREGORIAN
X-ORIGINAL-URL:https://facilities.med.wustl.edu/events/
X-WR-CALDESC:Enterprise Physical Operations-Medicine - Events
BEGIN:VEVENT
UID:20160715T1800Z-1468605612.0692-EO-4961-1@128.252.98.35
STATUS:CONFIRMED
DTSTAMP:20260709T010338Z
CREATED:20160715T174704Z
LAST-MODIFIED:20160715T174704Z
DTSTART;TZID=America/Chicago:20160725T070000
DTEND;TZID=America/Chicago:20160805T160000
SUMMARY: East McDonnell/4515 McKinley Sidewalk Construction
DESCRIPTION: In order to install a new trench drain near East McDonnell\, t
 here will be an intermittent disruption of the use of the east lobby door a
 nd a narrowing of the sidewalk between East McDonnell and 4515 McKinley for
  approximately two weeks from July 25 to August 5 from 7am to 4pm daily. Ad
 ditionally\, during this […]
X-ALT-DESC;FMTTYPE=text/html: <p>In order to install a new trench drain nea
 r East McDonnell\, there will be an intermittent disruption of the use of t
 he east lobby door and a narrowing of the sidewalk between East McDonnell a
 nd 4515 McKinley for approximately two weeks from July 25 to August 5 from 
 7am to 4pm daily.</p><p>Additionally\, during this time\, a section of crac
 ked concrete at the East McDonnell Research Building west lobby door will a
 lso be replaced.</p>
CATEGORIES:Road Closures
ORGANIZER;CN="Michelle":MAILTO:lewismichelle@wustl.edu
URL;VALUE=URI:https://facilities.med.wustl.edu/events/event/east-mcdonnell4
 515-mckinley-sidewalk-construction/
END:VEVENT
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
DTSTART:20160313T080000
TZNAME:CDT
END:DAYLIGHT
END:VTIMEZONE
END:VCALENDAR
