BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Enterprise Physical Operations-Medicine//NONSGML Events//EN
CALSCALE:GREGORIAN
X-ORIGINAL-URL:https://facilities.med.wustl.edu/events/
X-WR-CALDESC:Enterprise Physical Operations-Medicine - Events
BEGIN:VEVENT
UID:20180307T1437Z-1520433477.6908-EO-15464-1@172.21.70.41
STATUS:CONFIRMED
DTSTAMP:20260706T202300Z
CREATED:20180307T143505Z
LAST-MODIFIED:20180307T143505Z
DTSTART;TZID=America/Chicago:20180306T013000
DTEND;TZID=America/Chicago:20180306T023000
SUMMARY: McMillan Hospital – Electric Service Interruption
DESCRIPTION: PRACTICE OUTAGE At approximately 1:30am there was a disruption
  with the electric system in the building which caused a malfunction with t
 he HVAC system causing a neutral/positive room pressure alarm for room 1103
  A-D. At this time no work should take place within this lab. At this time 
 Facilities Engineering is in the process of […]
X-ALT-DESC;FMTTYPE=text/html: <p>PRACTICE OUTAGE</p><p>At approximately 1:3
 0am there was a disruption with the electric system in the building which c
 aused a malfunction with the HVAC system causing a neutral/positive room pr
 essure alarm for room 1103 A-D. At this time no work should take place with
 in this lab. At this time Facilities Engineering is in the process of recov
 ering the HVAC systems. A follow-up message will be delivered once all mech
 anical systems and room pressures are working in a normal manner.</p><p>We 
 thank you for your patience and understanding at this time.</p>
CATEGORIES:Planned Service Interruption
ORGANIZER;CN="Michelle":MAILTO:lewismichelle@wustl.edu
URL;VALUE=URI:https://facilities.med.wustl.edu/events/event/mcmillan-hospit
 al-electric-service-interruption-3/
END:VEVENT
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:STANDARD
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
DTSTART:20171105T070000
TZNAME:CST
END:STANDARD
END:VTIMEZONE
END:VCALENDAR
