BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Enterprise Physical Operations-Medicine//NONSGML Events//EN
CALSCALE:GREGORIAN
X-ORIGINAL-URL:https://facilities.med.wustl.edu/events/
X-WR-CALDESC:Enterprise Physical Operations-Medicine - Events
BEGIN:VEVENT
UID:20160701T1352Z-1467381128.3734-EO-4917-1@128.252.98.35
STATUS:CONFIRMED
DTSTAMP:20260709T010339Z
CREATED:20160701T132703Z
LAST-MODIFIED:20160701T132703Z
DTSTART;TZID=America/Chicago:20160715T180000
DTEND;TZID=America/Chicago:20160718T050000
SUMMARY: Temporary Closure of BJCIH Loading Dock
DESCRIPTION: For the MCC Project\, in order to allow installation of precas
 t concrete at the BJCIH loading dock entrance\, the service drive will be c
 losed from Taylor Avenue to the BJCIH loading dock from Friday\, July 15 at
  6pm until Monday\, July 18\, 2016 at 5am. Pedestrian traffic will not be a
 ffected by this shutdown. See […]
X-ALT-DESC;FMTTYPE=text/html: <table width="100%"><tbody><tr><td>For the MC
 C Project\, in order to allow installation of precast concrete at the BJCIH
  loading dock entrance\, the service drive will be closed from Taylor Avenu
 e to the BJCIH loading dock from Friday\, July 15 at 6pm until Monday\, Jul
 y 18\, 2016 at 5am. Pedestrian traffic will not be affected by this shutdow
 n. See <a href="https://facilities.med.wustl.edu/app/uploads/2016/06/Loadin
 g-Dock-Closure.png"><strong>map </strong></a>for more information.</td></tr
 ></tbody></table><p></p>
CATEGORIES:Road Closures
ORGANIZER;CN="Michelle":MAILTO:lewismichelle@wustl.edu
URL;VALUE=URI:https://facilities.med.wustl.edu/events/event/temporary-closu
 re-of-bjcih-loading-dock/
END:VEVENT
BEGIN:VTIMEZONE
TZID:America/Chicago
BEGIN:DAYLIGHT
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
DTSTART:20160313T080000
TZNAME:CDT
END:DAYLIGHT
END:VTIMEZONE
END:VCALENDAR
