Outages

Barnard Hospital-Air Handling Unit Service Interruption 7/7/2021-7/9/2021

The purpose of this outage is to recommission the temperature controls for the Air Handler Unit and the Chilled Water System that support the basement Cyclotron. During this outage the Air Handler Unit and Chilled Water System will be turned on and off as Facilities staff calibrate and replace temperature/humidity sensors, test motors and dampers and verify the programmed sequence of operation for these systems.

7/7/21 Start Time – 5:00 a.m. Finish Time – 7:00 a.m.
7/8/21 Start Time – 5:00 a.m. Finish Time – 7:00 a.m.
7/9/21 Start Time – 5:00 a.m. Finish Time – 7:00 a.m.