Outages

Steven & Susan Lipstein BJC Institute of Health-Electric Service Interruption 3/9/2022

In order to support construction on the vertical expansion of the Steven & Susan Lipstein BJC Institute of Health building, power to the Mid Campus Center building will be switched on the backend. All switching will be done during the above listed times. Throughout the entirety of this work, Facilities expects no interruptions or power loss to users.