On Sunday, February 25th 4-7 am Facilities contractor’s will be trouble shooting switchgear, no power loss or blips is expected. As a precautionary measure , no work may occur in NTA 4th fl. ABSL3 suites and PEDS MPRB suites 7230, 7301,730 and 7230.
On Sunday, February 25th 4-7 am Facilities contractor’s will be trouble shooting switchgear, no power loss or blips is expected. As a precautionary measure , no work may occur in NTA 4th fl. ABSL3 suites and PEDS MPRB suites 7230, 7301,730 and 7230.