Northwest Tower, Mid Campus Center-Elevator Service Interruption 10/29-30/2025

Elevators in the listed buildings will be out of service for testing on emergency generator power each day between 5:00 am and 6:00 am. During this time, lighting and equipment connected to the emergency power system may experience a brief disruption when the power is transferred. The following list indicates which buildings’ elevators will be […]

Clayton Garage-Elevator Service Interruption 10/28/2025

On Tuesday, October 28, the elevators will be tested on emergency generator power between 5:00 am and 6:00 am. During this time, the lighting and equipment connected to the emergency power system may experience a brief disruption when the power is transferred.

Wohl Clinic-Air Handling Unit Service Interruption 10/4/2025

On Saturday, October 4 6 a.m. – 2 p.m., areas on the 9th floor of the Wohl Clinic building will experience intermittent airflows. Facilities will monitor the space as they finish up repair work on the unit that serves the area.

October 1-21: Exterior Window Cleaning

Beginning October 1, workers will commence exterior window cleaning on the pedestrian link between the Farrell Learning & Teaching Center/Mid Campus Center. This project will require technicians to use a lift to traverse along the concrete grounds, over the CWE Metro station, and down Euclid Avenue. The path of traffic will remain accessible at all […]