McDonnell Pediatric Research Building-7303 Diamond BSL3 Lab Service Interruption 9/11/2025

The MPRB 7303 Diamond BSL3 Lab will be shut down briefly (approximately 15 minutes or less) at two different points during the outage times listed above in support of the scheduled decontamination of the adjacent 7302 Philips BSL3 lab. This outage is a precautionary measure as the supply/exhaust air is shut down for the Philips […]

September 8-10: Road Closure – Clayton & Taylor Avenues Intersection

Sent on behalf of Utility Traffic Restoration. Workers will close a section of Clayton and Taylor Avenues due to Spire’s work on the natural gas lines from September 8 to September 10, from 6 am to 4 pm. If you have any questions, please contact Kyle Fenstermaker from Utility Traffic Restoration at 314-346-5972.

Clinical Sciences Research Building-Elevator Service Interruption 9/9-10/2025

As part of the project to upgrade the fire alarm system in CSRB, the elevators will be removed from service, one at a time, to allow new fire alarm devices to be installed in the hoist ways. While one elevator is out of service, the other elevators will continue to operate. This will happen between […]

September 2: Euclid Avenue road work by McMillan

Spire is performing work along Euclid Avenue today (September 2) and will be digging a 3’x5’ hole in between the McMillan entrance and IWJ entrance in the street along the curb. Currently, we do not know the duration of this work; however, street access may be limited during this activity. They will be plating over […]