CSRB North Tower Addition-HVAC Service Interruption 5/15/2025

On Thursday, May 15th, 3-6 am, the HVAC system supply and exhaust system flows may be reduced to the 4th and 5th floor vivarium and lab spaces to perform preventive maintenance. NO work shall be performed in any BSL3 lab during this time.

Clayton Garage-Elevator Service Interruption 5/8-5/12/2025

Thursday, May 8th, 6 pm – May 12th, 4 pm The South elevators, #58 & 59, will be taken out of service to complete some renovation work and move the barricades. Elevator 59 will be returned to service once the work is complete.

Southwest Tower-7th Floor Service Interruptions 5/2-3/2025

On May 2nd, 3 pm – May 3rd, 3 pm. To make repairs, freezer 722-A on the 7th floor will be shut down on Friday, 5/2, at 3 pm. Please ensure all temperature-sensitive products are removed from the freezer by that time.