Clinical Sciences Research Building-Exhaust Fan Service Interruption 10/5/2024

On Saturday, October 5th, 6am – 2 pm, Facilities will turn off the exhaust fan for the north end of the 8th floor to make necessary repairs. During this times, the north end of the 8th floor will experience no exhaust air. No work should occur in the fume hoods during time.

Steven & Susan Lipstein BJC Institute of Health-Exhaust Fan Service Interruption 9/24-26/2024

During the dates and times noted below facility technicians will be performing preventative maintenance on the HVAC systems serving the lower-level vivarium including the B120 BSL3 suite. During these times NO work shall take place within the B120 BSL3 suite. 9/24 4:30 am to 6:30 am9/25 4:30 AM to 6:30 am9/26 4:30 AM to 6:30 […]

McDonnell Pediatric Research Building-Air Handling Unit Service Interruption 9/23-28/2024

On September 23rd, 8 pm – September 28th, 6 am, Facilities will turn off the air handler that serves the pedestrian link and administrative offices for the south section of the building for floors 3 through 11. During the noted outage times, the airflow to these affected areas will experience minimal to no airflow and […]

McDonnell Pediatric Research Building-Air Handling Unit Service Interruption 9/24-26/2024

The supply and exhaust systems serving the BSL3 suites are due for scheduled preventative maintenance this month. The technicians will complete the work over the course of three early morning outage as identified below. Tuesday September 24, 2024: 3:00 am to 7:00 am.Wednesday September 25, 2024: 3:00 am to 7:00 am.Thursday September 26, 2024: 3:00 […]

McDonnell Pediatric Research Building-Air Handling Unit Service Interruption 9/30-10/14

Facilities Operations will conduct HAVC outages each night from 8 pm to 6 am on the east side of the 8th floor between the above-noted dates. Expect to see contractors and cleaning equipment in the hallway areas and some interior labs. There will be a decrease in airflow from the supply air vents above, an […]

CSRB North Tower Addition-HVAC Service Interruption 9/21-30/2024

Facilities Engineering has a project to upgrade the HVAC systems serving the 4th and 5th floors of the building. To complete the work outages will be needed based on the schedule noted below. During those noted times there shall be NO work conducted in any of the BSL3 labs on the 4th floor of CSRB […]

East Building roof replacement update

Workers began the replacement of the East Building’s roof on September 9th. The roof replacement project will require a series of mobile crane picks. Each crane pick will occur from the service drive on the north elevation to avoid the continual vehicular and pedestrian traffic on Scott Avenue. The project’s construction hours are 6:30 am […]