Clinical Sciences Research Building-Hot Water Service Interruption 12/21/2023

On Thursday, December 21st 2-10 am Facilities will be assisting contractors with draining the heating hot water for the 7th floor. The temperature for the air handler supply will be raised to provide heat to the entire floor. The entire floor may experience cooler-than-normal temperatures during this time.

Wohl Clinic-Air Handling Unit Service Interruption 12/16/2023

On Saturday, December 16th at 6 am – 4 pm Facilities will turn off the air handler that serves the 9th floor and part of the 10th floor to make necessary repairs. Temperatures will vary during the above-noted dates and times. No animal-holding areas will be affected by this outage.

East Building-Scott Avenue Entrance Service Interruption 12/26-12/28/2023

On Tuesday, December 26th, to Thursday, December 28th, contractors will work to replace the interior and exterior doors at the Scott Ave entrance to the East Building. The entrance will remain operational during this time but we ask that you please adhere to all posted safety signage and direction given by the contractors working on-site.