Facility condition assessments begin in Couch, Eric P. Newman Education Center, Becker Medical Library, McDonnell Pediatric Research Building and Renard

From June 10, 2024, through September 27, 2024, WUSM OFMD, along with architect and engineer representatives, will begin conducting facility condition assessments within and outside the following buildings: Couch, Eric P. Newman Education Center, Becker Medical Library, McDonnell Pediatric Research Building, Renard. Those conducting the assessments will walk the buildings inside and out with WUSM […]

Hope Plaza update

OFMD would like to provide an update on Hope Plaza. As you know, we used Hope Plaza for construction access and laydown area during the construction of the BJCIH Vertical Expansion. Starting in June 2024, we will begin preparing to restore the plaza. We will address maintenance on the fountain plaza, improve stormwater capacity, and […]

Shell Café – Bite of St. Louis, Monday, June 10th

As part of Bon Appetit’s Bite of St. Louis initiative, Shell Café will be serving the Tasty as Cluck-Burrito from BLK MKT Eats on Monday, June 10th, as a café special. The burrito includes southern fried chicken, kimchi slaw, arugula, BLK MKT pickles, crispy shallots, and og fire sauce, wrapped in white rice and nori, […]

McDonnell Pediatric Research Building-Air Handling Unit Service Interruption 6/15/2024

On Saturday, June 15th 6 am – 6 pm facilities will be making improvements to the HVAC systems serving supply air to the laboratories throughout the building. During the outage occupants of the labs can expect to experience reduced supply air flow, a change in HVAC noise levels , and a possible rise in space […]

4488 Forest Park-Domestic Cold Water Service Interruption 6/9/2024

On Sunday, June 9th 6 am – 2 pm contractors are connecting a new water line for irrigation. During this outage there will be no water available in the building. There will be no hot or cold water in any of the break areas or restrooms.

McDonnell Medical Sciences Building-Elevator Service Interruption 6/10/2024

On Monday, June 10th 5-6 am in support of the 9th Floor renovation project, contractors need to temporarily refeed power to the elevator cab lighting. Each elevator will be briefly taken out of service, one at a time, while contractors rework the power to the cab lights. Each cab will be returned to service as […]

West Building-Air Handling Unit Service Interruption 6/15/2024

On Saturday, June 15th 6 am – 2 pm contractors will be making necessary repairs to the air handler serving the fifth floor. The entire floor may experience warmer-than-normal temperatures during the above-noted dates and times.

West Building-Air Handling Unit Service Interruption 6/8/2024

On Saturday, June 8th 6 am – 2 pm contractors will be making necessary repairs to the HVAC system serving room 1700 and lab 1754. Temporary cooling will be installed where freezers are in use. Room 1700 and lab 1754 may experience warmer than normal temperatures during the above-noted dates and times.