Workers will excavate the drive between the Farrell Learning & Teaching Center (FLTC) and the Euclid Power Plant between Wednesday, July 5th and Monday, August 21st (weather dependent). We will close all vehicular and pedestrian access to this area. Pedestrians must use the FLTC for access between Euclid and Scott Avenues. Please see the photos […]
Author: Melanie
Construction Safety Week – safety on a busy work site
Sent on behalf of Barnes-Jewish Hospital. Constructing the new Barnes-Jewish Hospital patient care tower is complex with hundreds of workers performing dozens of tasks all around one another as they work toward the mid-2025 opening of 280 private rooms for heart & vascular patients, radiology and surgical prep and recovery. The work can pose hazards, […]
Work at Maternity Building parking exit Saturday, June 10th
Sent on behalf of Barnes-Jewish Hospital. Contractors will be working at the Maternity Building parking exit this Saturday, June 10, starting around 7 am. They will be trenching across the exit lane and sidewalk. Vehicles may need to turn around and exit to the east if the contractors are digging in the exit lane. A […]
CSRB North Tower Addition-BSL# 434/445 Door Service Interruption 6/14/2023
In order for facilities to repair a door issue BSL3 lab 434/445 will be out of service during the above noted times. During this time NO work shall take place inside the lab.
Cancer Research Building, Core@818-Elevator Service Interruption 6/26/2023
Elevators in the listed Buildings will be out of service for 2 to 3 hours on June 26, any time between 7:00 am and 3:30 pm to conduct 5-year inspections, and fire service recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected on […]
Mallinckrodt Institute Radiology, CSRB North Tower Addition, Wohl Hospital, Metro Garage, Barnard Hospital-Elevator 6/23-30/2023
Elevators in the listed buildings will be out of service for about 2 to 4 hours between 7:00 am and 3:30 pm on June 26 through June 30, to conduct annual inspections and fire recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected […]
CSRB North Tower Addition, Cancer Research Building, Wohl Hospital, Metro Garage-Elevator Service Interruption 6/27-30/2023
Elevators in the listed buildings will be out of service to be tested on emergency generator power, from 6 am to 7 am on Tuesday, June 27, through Friday, June 30. During this time lighting and equipment connected to the emergency power system may experience a blip when power is transferred. The list that follows […]
CSRB North Tower Addition-CSRB North Tower Addition-Air Handling Unit Service Interruption 6/13/2023
On Tuesday, June 13th 5:00 am – 6:30 am facilities technicians will be performing preventive maintenance the the air handling and exhaust systems serving the 4th and 5th floors. Occupants may experience lower supply and exhaust air flow. During this time NO work shall take place in any BSL3 lab.
McDonnell Pediatric Research Building-Exhaust Fan Service Interruption 6/17-19/2023
To improve the exhaust system and reduce the risk of unplanned failure, Facilities Technicians will replace a motor serving the BSL3 suite 8201. To complete this work there will be a series of outages needed. The outages will follow the schedule below. During the times noted there shall be NO work allowed in BSL3 suite […]
Steven & Susan Lipstein BJC Institute of Health-DI Water Service Interruption 6/17/2023
On Saturday, June 17th 7:00 am – 3:00 pm contractors will be working on the the RO system that feeds floors 7 through 11 and the lower level vivarium in support of the vertical expansion project. These areas of the building will not have RO water available to them during this time.