Mallinckrodt Institute Radiology-Elevator Service Interruption 6/4/2023

Elevator 102 will be out of service on Sunday, June 4, at 8 am for 4 hours to perform preventive maintenance. Also during this time, annual inspections, fire recall tests and emergency power tests, as required by the Elevator Safety Unit of the Missouri Department of Public Safety will be performed. The elevator will be […]

Wohl Hospital-Air Handling Unit Service Interruption 5/12/2023

On Friday, May 12th 3:30 am – 8:00 am contractors will be making necessary repairs to the air handler that feeds floors seven and eight. Floors seven and eight may experience loss of airflow and slightly warmer than normal temperatures.

East Imaging Center-Air Handling Unit Service Interruption 5/12/2023

On Saturday, May 13th from 6 am to 3 pm in the East Imaging Center Air handling unit B2 will be off for system modifications in room 0308 and 0035 of the basement. In this time there will limited to no heating/cooling and airflow to the east portion of the basement.

Genome Data Center-Electric Service Interruption 5/20/2023

On Saturday, May 20th 6 am – 5 pm Facilities/Contractors will be making a repair to one of the output wires for UPS – 7W on the East side of the Genome Data Center, they will also be testing the other wires in the same wire tray. To complete this work, we will be powering […]

UPDATED-CSRB North Tower Addition-Air Handling Unit 5/17/2023

On Wednesday, May 17-18 8 pm – 12 am Facilities Technicians will be performing preventive maintenance on the air handling and exhaust systems for the 4th and 5th floor. During this time occupants may experience a slight rise in temperatures in the common space areas. To ensure safety all BSL3 labs on the 4th floor […]