Elevator 102 will be out of service on Sunday, June 4, at 8 am for 4 hours to perform preventive maintenance. Also during this time, annual inspections, fire recall tests and emergency power tests, as required by the Elevator Safety Unit of the Missouri Department of Public Safety will be performed. The elevator will be […]
Author: Melanie
Wohl Hospital-Air Handling Unit Service Interruption 5/12/2023
On Friday, May 12th 3:30 am – 8:00 am contractors will be making necessary repairs to the air handler that feeds floors seven and eight. Floors seven and eight may experience loss of airflow and slightly warmer than normal temperatures.
Irene W Johnson Institute Rehab, South Medical Building-Elevator Service Interruption 6/5-9/2023
Elevators in the listed buildings will be out of service for about 2 to 4 hours between 7:00 AM and 3:30 PM, June 5 through June 9, to conduct annual inspections and fire recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected on […]
East Imaging Center-Air Handling Unit Service Interruption 5/12/2023
On Saturday, May 13th from 6 am to 3 pm in the East Imaging Center Air handling unit B2 will be off for system modifications in room 0308 and 0035 of the basement. In this time there will limited to no heating/cooling and airflow to the east portion of the basement.
South Medical Building-Air Handling Unit Service Interruption 5/8/2023
On Monday, May 8th from 6 am to 9 am Air handling unit one for the South Medical Building will be off to finish upgrades to the unit. In this time frame there will be little to no heating/cooling capabilities and air flow to the first floor.
CSRB North Tower Addition-BSL3 Lab 452/462 Service Interruption 5/10/2023
In order for facilities to replace lamps BSL3 lab 452/462 will be out of service during the above-noted time. During this time NO work shall take place in the lab.
Genome Data Center-Electric Service Interruption 5/20/2023
On Saturday, May 20th 6 am – 5 pm Facilities/Contractors will be making a repair to one of the output wires for UPS – 7W on the East side of the Genome Data Center, they will also be testing the other wires in the same wire tray. To complete this work, we will be powering […]
Steven & Susan Lipstein BJC Institute of Health-Air Handling Unit Service Interruption 5/18/2023
On May 18th 8 pm-12:00 am facilities technicians will be performing preventative maintenance on the air handling units serving the lower-level vivarium including the BSL3 suites. The lower level should experience no change in temperature or airflow however, out of an abundance of caution NO work shall take place in the B120 BSL3 suite.
UPDATED-CSRB North Tower Addition-Air Handling Unit 5/17/2023
On Wednesday, May 17-18 8 pm – 12 am Facilities Technicians will be performing preventive maintenance on the air handling and exhaust systems for the 4th and 5th floor. During this time occupants may experience a slight rise in temperatures in the common space areas. To ensure safety all BSL3 labs on the 4th floor […]
Specialized Research Facility East-Elevator Service Interruption 5/3-4/2023
Elevator #82 will be out of service until further notice for inspection and testing needs.