McDonnell Pediatric Research Building-Air Handling Unit Service Interruption 2/22/2024

On Thursday, February 22nd 5-8 am Facilities will turn off the air handler serving the pedestrian link and administration offices for the south section of the building for maintenance. The pedestrian link along with the administration offices located on floors 3 through 11 will experience loss of airflow and cooler-than-normal temperatures during the above-noted dates […]

CSRB North Tower Addition-Fire Alarm Service Interruption 2/29/2024

On Thursday, February 29th 3-6 am In preparation of the upcoming NTA fire alarm upgrade project, the OFMD fire alarm crew will be completing some work on the existing fire alarm system that serves the supply air units serving the 4th floor biohazard area. As a precautionary measure, no work may occur in the 4th […]

REVISED-Jeffrey T. Fort Neuroscience Research Building-Exhaust Fan Service Interruption 2/23/2024 3:30 am-6 am

We plan to reduce to minimum the airflow supply and exhaust on units that serve level 3 through level 10 open labs/offices/vertical vivarium (not including level 10 primate holding and OR areas). Spaces served by this equipment should still experience limited air changes – though not necessarily consistent throughout and room pressure monitors may go […]

Southwest Tower-Air Handling Unit Service Interruption 3/2/2024

On Saturday, March 2 6 am-2 pm Facilities will perform necessary repairs to the air handler that serves floors 6, 7, and 8. Floors 6, 7, and 8 may experience slightly warmer than normal temperatures during this time.

CSRB North Tower Addition-Electric Service Interruption 3/17/2024 3-7 am

The purpose of this outage is to perform maintenance and testing on the ‘W’ feed portion of the NTA main electrical switchgear. Facilities electricians will perform switching, to isolate and de-energize the ‘W’ feed. Facilities electricians and Service Contractors will inspect and test the breakers, relays, and major components of the de-energized portion of the […]