CSRB North Tower Addition-Electrical Service Interruption 9/23/2025 and 9/24/2025

To facilitate essential preventative maintenance, Facilities will conduct two scheduled outages on the dates and times listed below: Monday, September 23 – 4:00 AM to 6:00 AMTuesday, September 24 – 4:00 AM to 6:00 AM During these periods, NO work is permitted within any 4th floor ABSL3/BSL3 suite. Additionally, occupants on the 4th and 5th […]

REVISED-McDonnell Medical Sciences Building-Exhaust Fan 9/19-20/2025

On Friday, September 19, at 3 pm, through Saturday, September 20, at 2:30 pm, exhaust fan 36 will be shut down to assist contractors in replacing it with a new exhaust fan for the 9th-floor construction project. This will affect all bathroom exhaust in the entire facility. This outage will affect fume hoods 820A, 820B, […]

Steven & Susan Lipstein BJC Institute of Health-Steam Service Interruption 9/27/2025

On Saturday, September 27, 5 am – 5 pm Facilities will be shutting down the process steam to allow contractors to make necessary tie-ins on the system. During this time, all autoclaves, glass washers, steam humidifiers, cage wash facility equipment, and kitchen equipment utilizing steam will be unavailable.

McDonnell Pediatric Research Building-7303 Diamond BSL3 Lab Service Interruption 9/11/2025

The MPRB 7303 Diamond BSL3 Lab will be shut down briefly (approximately 15 minutes or less) at two different points during the outage times listed above in support of the scheduled decontamination of the adjacent 7302 Philips BSL3 lab. This outage is a precautionary measure as the supply/exhaust air is shut down for the Philips […]

Clinical Sciences Research Building-Elevator Service Interruption 9/9-10/2025

As part of the project to upgrade the fire alarm system in CSRB, the elevators will be removed from service, one at a time, to allow new fire alarm devices to be installed in the hoist ways. While one elevator is out of service, the other elevators will continue to operate. This will happen between […]