The air handler that serves floors 2,3,4,5, and 9 is out of service. Facilities are working on the necessary repairs. These floors will experience warmer than normal temperatures. A follow-up notification will be sent when the unit has been restored.
Category: Outages
Cancer Research Building-Fire Alarm Service Interruption 9/21/2023
On Thursday, September 21st 9:00-11:30 am Facilities will be testing the Audio/Visuals for the Fire Alarm System on the 4th and 5th floor of the Cancer Research Building as part of the final inspection. During this time, you will hear messages and see strobes throughout the entire building, occupants do not need to leave the […]
Mallinckrodt Institute Radiology-Air Handling Unit Service Interruption 9/25/2023
On Monday, September 25th 3:30-8:00 pm Facilities will be testing the fire alarm system for the air handlers throughout the entire building during the above-noted dates and times. Each air handler will be off for a short period of time. Customers should not experience any extreme temperature changes during this outage.
Mallinckrodt Institute Radiology-Air Handlers Service Interruption 9/27/2023
On Wednesday, September 27th 3:30 – 8:00 pm Facilities will be checking the fire alarm system for the air handlers throughout the entire building during the above-noted dates and times. Each air handler will be off for a short period of time. Customers should not experience any extreme temperature changes during this outage.
Mallinckrodt Institute Radiology-Elevator Service Interruption 10/8/2023
Elevator 102 will be out of service on Sunday, October 8, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back on service at noon.
Mallinckrodt Institute Radiology-Elevator Service Interruption 10/22/2023
Elevator 103 will be out of service on Sunday, October 22, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.
Mallinckrodt Institute Radiology-Fire Alarm Service Interruption 9/29/2023
On Friday, September 29th 5-7 am Facilities will be testing the Audio/Visuals for the fire alarm system in Mallinckrodt Institute of Radiology during the above date and time. During this time, you will hear messages and see strobes throughout the entire building, occupants do not need to leave the building during this test.
Clinical Sciences Research Building, Mid Campus Center-Elevator Service Interruption 10/10-10/12/2023
Elevators in this building will be out of service for about 2 to 4 hours between 7:00 am and 3:30 pm on October 10, through October 12, to conduct annual inspections and fire recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected on […]
CSRB North Tower Addition-Compressed Air Service Interruption 9/12-9/13/2023
On Tuesday, September 12th 1:15 pm – Wednesday, September 13th 7 am Facilities will be working on the compressed air system that serves all of the autoclaves throughout the building. There will be no air available to the autoclaves. A follow-up notification will be sent once the lab air is back to normal.
Cancer Research Building-Fire Alarm Service Interruption 9/21/2023
on Thursday, September 21st 9-11:30 am Facilities will be testing the Audio/Visuals for the Fire Alarm System on the 4th and 5th floor of the Cancer Research Building as part of the final inspection. During this time, you will hear messages and see strobes throughout the entire building, occupants do not need to leave the […]