On Monday, June 19th 6 am – Friday, June 30th 4 pm the restrooms located on the lower level of the Bernard Becker Medical Library will be closed for renovations. Alternate restrooms can be found in the first floor hallway of the Cancer Research Building or on the second floor of the library behind the […]
Category: Outages
CSRB North Tower Addition-BSL# 434/445 Door Service Interruption 6/14/2023
In order for facilities to repair a door issue BSL3 lab 434/445 will be out of service during the above noted times. During this time NO work shall take place inside the lab.
Cancer Research Building, Core@818-Elevator Service Interruption 6/26/2023
Elevators in the listed Buildings will be out of service for 2 to 3 hours on June 26, any time between 7:00 am and 3:30 pm to conduct 5-year inspections, and fire service recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected on […]
Mallinckrodt Institute Radiology, CSRB North Tower Addition, Wohl Hospital, Metro Garage, Barnard Hospital-Elevator 6/23-30/2023
Elevators in the listed buildings will be out of service for about 2 to 4 hours between 7:00 am and 3:30 pm on June 26 through June 30, to conduct annual inspections and fire recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected […]
CSRB North Tower Addition, Cancer Research Building, Wohl Hospital, Metro Garage-Elevator Service Interruption 6/27-30/2023
Elevators in the listed buildings will be out of service to be tested on emergency generator power, from 6 am to 7 am on Tuesday, June 27, through Friday, June 30. During this time lighting and equipment connected to the emergency power system may experience a blip when power is transferred. The list that follows […]
CSRB North Tower Addition-CSRB North Tower Addition-Air Handling Unit Service Interruption 6/13/2023
On Tuesday, June 13th 5:00 am – 6:30 am facilities technicians will be performing preventive maintenance the the air handling and exhaust systems serving the 4th and 5th floors. Occupants may experience lower supply and exhaust air flow. During this time NO work shall take place in any BSL3 lab.
McDonnell Pediatric Research Building-Exhaust Fan Service Interruption 6/17-19/2023
To improve the exhaust system and reduce the risk of unplanned failure, Facilities Technicians will replace a motor serving the BSL3 suite 8201. To complete this work there will be a series of outages needed. The outages will follow the schedule below. During the times noted there shall be NO work allowed in BSL3 suite […]
Steven & Susan Lipstein BJC Institute of Health-DI Water Service Interruption 6/17/2023
On Saturday, June 17th 7:00 am – 3:00 pm contractors will be working on the the RO system that feeds floors 7 through 11 and the lower level vivarium in support of the vertical expansion project. These areas of the building will not have RO water available to them during this time.
Steven & Susan Lipstein BJC Institute of Health-Air Handling Unit 6/28-29/2023
On June 28th 6 pm-June 29th 12:00 am contractors will be making repairs to the air handlers that feed floors 7 through 11. Floors 7 through 11 will not have any supply or exhaust air during these times. No work should be performed in any fume hoods during these times. Facilities will be monitoring temperatures […]
Couch Biomedical Research Building-Gas Service Interruption 6/7/2023
On June 6th from 7 am to 12 pm there with be a medical gas outage to the 2nd floor of the Couch Biomedical research building. This will only affect the west half of the second floor there be limited to no lab air, vacuum, gas, argon, and nitrogen in this time.