On November 21st from 6 am to 8 am there will be a vacuum outage to the the first floor of the Couch Biomedical Research Building. In this time frame there will be limited to no vacuum to only the first floor.
Category: Outages
McDonnell Pediatric Research Building-lab 7303A , BSL3 suite 7303 Service Interruption 11/18/2022
In order to make repairs in lab 7303A , BSL3 suite 7303 we be out of service on Friday, November 18th 8:30 am – 12:30 pm. During this time NO BSL3 work shall take place within the suite.
McMillan Hospital-Air Handling Unit Service Interruption 11/21/2022-12/6/2002
To make repairs , conducting testing, and perform preventive maintenance the AHU serving parts of the 10th and 11th floors will experience interment shutdowns from Monday, November 21st 7 am – Tuesday, December 6th. During this time occupants can expect to feel possible changes in airflows and temperatures. Facilities technicians will monitor conditions during each […]
McMillan Hospital-Air Handling Unit Service Interruption 11/18/2022-11/20/2022
To perform preventative maintenance and make repairs there will be no supply airflow to parts of the 10th and 11th floor between Friday, November 18th 5 pm – Sunday, November 20th 7 am. During this time facilities, technicians will be monitoring floor temperatures and will be able to make adjustments if needed.
4560 Clayton Avenue – DI Water Service Interruption 11/14/2022-11/18/2022
On November 14th at 11 am there was a failure on the DI water system in the 4560 Clayton Ave. building. At this time there is little to no DI water to the second floor of the building. We have called for service and will update all affected once we have more information.
Couch Biomedical Research Building-Compressed Air Service Interruption 11/16/2022
On Wednesday, November 16th from 6 am to 8:30 am there will be a compressed air outage to the entire building of Couch Biomedical Research Building to install new lines for a lab on the first floor. In this time frame there will be limited to no compressed air to all floors in the building.
McDonnell Medical Sciences Building-Air Handling Unit Service Interruption 11/29/2022
On Tuesday, November 29th from 4 am to 7 am there will be no airflow to the 5th floor of McDonnell Medical Sciences Building for preventative maintenance of AHU #2. This will effect supply air flow to the BSL-3. During this outage there will be no supply air flow to 562A-BSL3 lab. NO WORK SHALL […]
Mallinckrodt Institute Radiology-Elevator Service Interruption 12/4/2022
Elevator 102 will be out of service on Sunday, December 4, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.
Mallinckrodt Institute Radiology-Elevator Service Interruption 12/18/2022
Elevator 103 will be out of service on Sunday, December 18, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.
CSRB North Tower Addition-Elevator Service Interruption 11/8/2022-/11/15/2022
Both elevators #1 & #2 will be out of service from November 8th 6 am – November 15th 6 am so that contractors can finish up the required modernization work on elevator #2. They will also be moving the construction barriers to prepare for modernization to begin on Elevator #1. Elevator #2 will be back […]