3/14: SRF + East, Planned Service Interruption – Air Handling Unit

On 3/14 from 7 am to 7 pm, Air Handler 1 will be shut down to facilitate the installation of a new air filter system. This will affect the Cage wash areas, office spaces, and general areas on the 1st floor. Animal spaces will not be affected. Thank you for your patience.

3/14: McMillan, Planned Service Interruption – Chilled Water

Facilities will drain the chilled water in the building to assist contractors with upgrading the system. On 3/14 from 4 am to 6 pm, facilities will place supplemental spot coolers in certain areas and monitor other areas as needed. Customers may notice warmer-than-normal temperatures during these times.

3/9-4/2: Fort Labs, Planned Service Interruption – Electric

From 6 am to 8 am from 3/9 to 4/2, facilities electricians, along with contractors, will de-energize power on select floors per the scheduled dates. Power will be affected only from 6 AM – 8 AM on Mondays – Thursdays for the duration of the outage listed above. The purpose of this outage is to […]