Default image

Incident No. 2308-00353 (Protective Services Incident)

Fire
Date & Time Occurred: 08/12/2023 6:00 am
Date & Time Reported: 08/12/2023 9:59 am
Location: Neuroscience Research Building (NRB) 8th Floor
Synopsis:  Construction workers at the NRB construction site reported damage to a bathroom caused by a fire in the toilet paper dispenser. They believed the fire was sent intentionally. There was damage to the wall, ceiling and neighboring stalls. Protective Services is investigating.
Disposition: Disposition Unknown