From December 16th at 12am to December 17th at 3pm, Ameren will be conducting repairs on transformers serving our substation. The following buildings will be affected: BJC-IOH and Mid Campus Center. As a precaution, Facilities will transfer power to these buildings prior to Ameren’s switching to prevent service interruption or voltage dips during the outage period.