Outages

1/30: 4522 McKinley, Planned Service Interruption – Air Handling Unit

On 1/30 from 4am to 6am, there will be a software patch for the building network engine outage. The previous start time was 5:00 am. The new start time will be 4:00 am. It is anticipated that the building HVAC systems shall operate during this outage. Facilities Engineering will have staff present if there are any failures with the building’s HVAC systems.