Outages

2/2: Fort Labs Planned Service Interruption – Electric

On 2/2 from 6am to 8am, facilities electricians, along with contractors, will de-energize the emergency power to the 10th-floor west side of the building to verify proper grounding of the transformer. Normal power will not be affected by this outage.