On 2/26 from 2 am to 7 am, Facilities will isolate and drain the chilled water and hot water heating on the 7th floor at the south end of the building to assist contractors with upgrades to a lab project. During this time, temperatures may fluctuate. Technicians will monitor the area and provide supplementary cooling and heating as needed.