3/9-4/2: Fort Labs, Planned Service Interruption – Electric

From 6 am to 8 am from 3/9 to 4/2, facilities electricians, along with contractors, will de-energize power on select floors per the scheduled dates. Power will be affected only from 6 AM – 8 AM on Mondays – Thursdays for the duration of the outage listed above. The purpose of this outage is to verify the proper grounding of the transformers on each floor. The detailed schedule will be shared with you separately by the Fort Labs Administration Team